Each state's daily merit-order despatch as uploaded by its DISCOM/SLDC: every plant the state can draw on, its costs, how much energy it declared available and how much was scheduled. Sorted by variable cost, this is the state's marginal-cost curve for that day — the benchmark RE and RE+storage must beat. Must-run plants (renewable, hydro, nuclear) are listed with no variable cost (site shows "999-").
| Report date | State code | State name | Merit order no | Station | Plant capacity (MW) | Capacity allocated (MW) | Station type | Ownership | Variable cost (₹/kWh) | Variable cost text | Fixed cost (₹/kWh) | Total cost (₹/kWh) | Declared capability (MWh) | Schedule (MWh) | Deviation (MWh) | Remarks |
|---|